State: Telangana
Drilling. Excavation, Loading, Transportation, Dumping, Spreading & Levelling Etc., Of 425.25 Lbcm Of In-Situ Ob (Which Includes 3.58 Lbcm Of Top Soil, 413.79 Lbcm Of Hard Ob & 7.88 Lbcm Of Coal) And Excavation Of 3.00 Lbcm Of Top Soil Beneath Extemal Dump With Conventional Equipment And Additional Works Viz., 1000 Shovel Hours, 1000 Dozer Hours & 5,000 Rmt Of Drilling
At Rg Oc-li Extension Project, Rg-lii Area During A Period Of 24 Months