State: Karnataka

Work of Design and Construction of up-gradation of existing 20MLD Capacity STP extended Aeration based on A20 process at Nagasandra Phase-1, Bangalore and 15 MLD ISPS at Medarahalli, 30 MLD ISPS at Bagalgunte, 25 MLD ISPS at NK Halli along with Pumping Mains and with Operation and Maintenance for a period of 7 years (2 years during Work Contract and Five (5) Years after Work Contract) on Turnkey Basis.