Survey, Sol Testing Investigation, Engineering Design, Fabrication of Lattice Type Tower Structures, Galvanization Supply of Structures, Laying of Foundations, Protection Works Erection of Tower, Laying & Stringing of ACSR ZEBRA Conductor, Inspection, Testing and Commissioning including Insurance, handling, storage of material at site for Realignment of 220 KV DIC KPTL Between location No. KP175-KP176 at village Baggallah