State: Haryana
Sl. No. 02, NIT NO. : EPC-04-CAO-C-SC-2023,
Dated 19-01-2023, Name of Work: SCR
Construction Organization EPC Through
Electrical General Services of South Central
Railway, Joining Point at CH
685.750, Adgaon Buzurg Station ( Including) and CH
697.300, engineering work of construction
for gauge conversion of track i.e.
(11.550 km) between Akot station (except).