State: Andhra Pradesh
Electrical Construction/ BZA : Guntur
Division: Guntur – Electrification Project (401.47
km) with Guntakal Doubling: At
Munumaka, Santhamagulur and
Savalyapuram stations for a period of about 15
days at each station Arrangements
for lighting, air coolers, fans, shamianas
and chairs etc. including arrangements
for temporary interrupted power supply
with DG nights, arrangements for working
breakfast/lunch/dinner/snacks etc. and
arrangement of accommodation (executive rooms)
and between Munumaka – Savalyapuram
section pre- Assessment of masks and
handwash sanitizers in relation to NI/NI
working
Supply.