Development of infrastructure facilities, 1. Provision of partitions with concrete flooring & fencing at scrap yard (2) Heavy material
storage area open with galvalume sheets Covered shed. Gooty Anu. B. Augmentation of Freight Maintenance Facilities Construction of Centralized Stores Depot for Box N ROH Depot at Gooty, Gooty Anu-C 140 TE Diesel Hydraulic