State: Bihar
Construction, track linking and O.M.W. Yes. Latching erection of Km. in Maharail Chandeshwar Sthan section with fabrication. 12.008km from Brihat Pul to 21 C (161.0 M.O.W.G.) in Vachaspati Nagar-Khutauna section. 31.749 at Major Bridge No. Construction of 36 A (10.45.7 M.O.W.G.)