State: Maharashtra

Construction of Road Over Bridges in lieu of (1) L-Xing No.55 at Ch.69.714 Km having span of 1 x 36m composite girder over Railway track and approaches consisting of 1 x 24m composite girder & 5 x 18m PSC girder & ramp with RE Wall and (2) L Xing No.65 at Ch. 82.328 Km having span of 1 x 36m composite girder over Railway track and approaches consisting of 4 x 18m PSC girder & ramp with RE Wall in connection with Provision of 4th line between Kalyan – Asangaon.