Construction of
boundary wall with Precast PSC Panel
& Precast Column and RCC Footing &
Column Cap in left over stretches
including on DFC side where IR tracks
are running parallel to DFC alignment
in connection with increase of speed to
160Kmph on Western Railway. (Total
length=180 Kms)