State: Jammu and Kashmir
by using ODEX method including provid-Mech.
ing, installation, testing, commissioning of
Mark-Hand Pumps and construction of
platform at 04 Nos KM 51.700 (Prem
Nagar) to KM 66.535 (New Thathri) of
14.84 KM Length of Khelani-Kishtwar-Jammu