(Signal and Telecom work related to Guntakal Division-below).
(i) MOLBs with EOLBs at interlocked LCgates (5 years) in Guntakal Division (ii) Defective signaling cables at 20 interlock LC gates in Guntakal Division (ii) Replacement of obsolete data loggers systems at 20 stations in Guntakal Division with new version data loggers.