State: Jharkhand

Construction of 200×150 mm dia & 225 mtr. depth HYDT, Const. of RCC Sump, Galvanized tubular Steel structure staging (4.5m. )Solar panel, 2000 1tr. capacity water Storage tank 04 nos Supplying and installation of 2.0 HP DC Solar motor pump complete set, Rising and distribution etc. Work at Budha pahar, Bargar Block under D. W.& S.Division, Garhwa for the year 2022-23.