otal length
of 20,859 km earth ballast reclamation at isolated locations (313,000-322,000
Bow Line, 336,000-3-41/300 Op Line WF Leg, KTM Leg, Shunting Neck, Road to
Satellite God Terminal 12 Kgm Diesel Z Line, Road to KJM | & 2) Sub-Workshop-2:
Bangalore – Kolarpet Division – Senior Divisional Engineer/ESBC
Division Bangarapet – Kolar Division Total from 132,200 to 148/500 SL 16.3 km.