State: Andhra Pradesh
Proposed construction of Road Under Bridge (RUB) instead of LCs 1) Km between CKN-BKL stations by air pushing method. 506/26-28 at Precast RCC Box Size 1X5.50X5.00m r LC No. 114 (M) up, ach & third line portion. 2. KM between CKN-BKL stations by air pushing method. 509/12-14 at Precast RCC Box Size 15.50X5.00mm
LC No. 115A(M) Up, Dn & third line portion, 3) Km between MDR- TNGM stations by box pushing method. * At 3/4-6 precast RCC box size 15.50X5.00M as LC No. 124(M) Up, Dn & Third Line Portion, 4) Km between YP-GNN stations by box pushing method. 552/0-2 at Precast RCC Box Size 1X5.50X5.00M LC No. 134(M) Up, Dn & third line portion, 5) Km between CVV -KI stations by box pushing method. 562/8-10 at LC No. 138(M) Up, Dn & Third Line Portion.

